Aker Qserv have global experience in the oil and gas industry

Job Displays

Stand alone wireline operation

Client - BP, Location - Miller platform, North Sea, UK

Overview

An intervention mast was mobilised and operated on the Miller drill floor during a coil tubing campaign to avoid working under a suspended load (CT injector head). Pre- operational work and site visits meant a solution could be sourced early.

Outcome

When the mast and injector were in place, Qserv carried out a stand alone operation. The mast was successfully mobilised to the platform and lifted onto the drill floor, eliminating the need for personnel to work below a suspended injector head. The dangers of using tuggers and lifting equipment on the drill floor were reduced due to the capabilities of the mast. Fine adjustments and movement offered by the mast meant that making and breaking the injector on and off the riser was simplified.

Photos
  • BP Miller 1
  • BP Miller 2
  • BP Miller 3

Return to Job Displays.

Copyright Aker Qserv Limited 2001 - 2010

Aker Qserv Ltd Registered Office: Badentoy Crescent, Portlethen, Aberdeen, Scotland AB12 4YD. Registered in Scotland.
Company Registration Number: SC225200.

Clicky Web Analytics