Client - BP, Location - Mungo platform, North Sea
Qserv supplied a full 5 1/8'' PCE wireline package c/w light weight lubricator, 5 1/8'' tool package and slimline unit utilizing 7/32” braided cable. Also supplied was a 90ft HighReach mast. A 90ft mast was used as a straddle was run in two parts, with both parts an approximate length of 30ft each. The PCE rig up height was close to 70ft. This was a 24 hour operation with crews shuttled daily, as there is only emergency accomodation on this facility.
The operation consisted of spotting and erecting the mast, then building a scaffolding tower to lower in the straddle and connect it to the tool string. The straddle was then run into the well and set over a water zone. This was the first time that BP had carried out operations using the 90ft mast and onboard an unmanned platform (NUI). The maximum lift was 5.5 ton.
Return to Job Displays.
Copyright Aker Qserv Limited 2001 - 2010
Aker Qserv Ltd Registered Office: Badentoy Crescent, Portlethen, Aberdeen, Scotland AB12 4YD. Registered in Scotland.Company Registration Number: SC225200.